PM Defined Connectathon Testable Assertions
From IHEWiki
Contents |
[edit]
Introduction
These are not formal testable assertions. As the Project Managers read the IHE Integration Profiles for technical requirements, they translate the profile language into requirements and then into test cases. These links will take you to pages that list those assertions/assumptions.
Note that these assertions are interpretations by the Project Managers and do not constitute documentation that has been reviewed by Technical Committees. Do not use these as formal requirements for products. Do use them to prepare for Connectathons.
[edit]
Cardiology
[edit]
IT Infrastructure
- ATNA logging for XDS
- BPPC Testable Assertions
- PDQ Testable Assertions
- PIX Testable Assertions
- XCA
- XDS (.a and .b)
[edit]
Laboratory
[edit]
Patient Care Coordination
[edit]
Patient Care Devices
[edit]
